Malarkey s shingle installation instructions require hand sealing shingles on slopes greater than 21 12 and strongly recommend it in adverse weather conditions when cold weather high winds and blowing dust can prevent a shingle s self sealing strip s from activating.
Malarkey roofing installation instructions.
Www malarkey roofing com for the most current version.
Installation with six 6 fasteners per starter shingle one fastener 1 25 mm from each end and the remaining four 4 evenly spaced on the same line.
Under normal conditions use four 4 fasten ers for each full shingle.
Malarkey manufactures a wide variety of membranes designed to satisfy the demands of varied roof and climatic conditions.
Malarkey ridge shingles are residential roofing product data guide translated shingle installation guides en espanol translated hip and ridge installation guides en francais.
Final note these instructions are meant to act as a general guide.
They may be superseded however wherever applicable.
The blog regularly covers topics including roofing systems product features and innovations contractor spotlights and company news.
The malarkey know your roof blog is an educational resource for homeowners and roofing industry professionals.
Read the latest post here.
These membranes are available with ceramic granules metal foil or sanded finishes designed to be installed with hot asphalt propane torch or cold process adhesives in all types of roofing waterproofing systems.
9 apr 2014 all other decking types must be approved by malarkey before installation to ensure that the shingles will comply and qualify for a limited material warranty.
3 malarkey windsor designer shingle installation instructions nailing pattern.
For superior pro tection in coastal regions areas of wind driven rain or homes with double slope construction the roof deck can be covered with a double layer of malarkey arctic seal self adhering underlayment or equivalent conforming to astm.
See malarkey s shingle accessory warranty online for any additional requirements related to specific coverages.
2 malarkey laminate shingle installation instructions optional installation for low slope roofs.
Use five 5 fasteners for each shingle evenly spaced across the shingle and placed within the high nailing area designated by the parallel nailing lines ensure the outside fasteners are approximately 1 25 mm from each.
Contact malarkey technical services1 or check our website at.